top of page
Trabajo1.jpg

Thermopower has over 30 years of experience in supplying and servicing industrial customers

Projects (Partial List)

Repair and commissioning work on power boilers in thermoelectric plants.

  • TECHNICAL STUDY FOR REPLACING THE CONDENSER PIPING.

  • DETAILED ENGINEERING DEVELOPMENT FOR THE INSTALLATION OF THE CONDENSER WATER COOLING SYSTEM.

  • SUPERVISION OF THE ASSEMBLY OF THE CONDENSER PIPING FOR THE THERMOSTAT.

  • TECHNICAL STUDY WITH SUPPORT FROM THE EQUIPMENT MANUFACTURER, TO DETERMINE THE INCREASE IN THE CAPACITY OF CAPTURING PARTICLES OF THE ELECTROSTATIC PRECIPITATOR, AT THE OUTLET OF THE COAL BOILER.

  • EVALUATION OF SOOT BLOWER SYSTEMS IN COAL BOILERS TO CORRECT PROBLEMS IN THE QUALITY OF THE BLOW STEAM.

  • EVALUATION OF PULVERIZED COAL BURNER SYSTEM, TO ADAPT THE FACILITIES ALLOWING THEIR MAINTENANCE.

  • CONVERSION TO GAS OF THREE UNITS – “RL15, 16 AND 17” (167 MW EACH).

  • ASSEMBLY, ALIGNMENT AND COUPLING OF RL-16 INDUCED DRAFT FAN MOTOR.

  • REPAIR OF CUP STRAINER RL-16.

  • REPAIR BOILER HOPPERS RL-16.

  • CLEANING AND REPAIR OF RL-14 TURBINE PARTS.

  • CORRECTION OF LEAKS IN THE DRINKING WATER SYSTEM PIPES, PLANT IV.

  • REPAIR OF THE INTERNAL TUBES OF THE STEAM/MUD DRUMS AND INSTALLATION OF MEMBRANE SEALS ON THREE EXTERNAL SOUTH WALL TUBES OF BOILER “S”.

  • BOILER INSPECTION SERVICE “S”.

  • EXTERNAL AND INTERNAL CLEANING OF BOILER RL-15.

  • INSTALLATION OF PUMPS FOR CONDENSER RECOVERY RL-15.

  • REPAIR OF EXPANSION JOINT OF CIRCULATION WATER PUMP RL14 EAST AND CUP STRAINER (FOR LAKE WATER FILTRATION) RL-14.

  • REFURBISHMENT OF RL-13/14 DEAERATOR.

  • REPAIR OF THE BOILER AND VAPORIZER BN-431BX.

  • GENERAL MAINTENANCE OF THE THREE-UNIT THERMOELECTRIC HYPOCHLORITE PLANT EL PASO OF 160 MW WITH DUAL BUNKER 6 / NATURAL GAS BURNERS.

  • INSTALLATION OF SAFETY VALVES FOR BOILER RL13/14.

  • INSTALLATION AND COMMISSIONING OF THE BOILER CLEANING SYSTEM TO AUTOMATE THE OPERATION OF SOOT BLOWERS IN BOILER RL15/16/17.

  • INSTALLATION AND COMMISSIONING OF 2 THERMOPROBE METERS IN UNIT RL16.

  • INSTALLATION AND MAINTENANCE OF SECONDARY AIR REGISTERS RL15/16/17.

  • INSTALLATION OF 22 IK 525 BLOWERS, 15 IR3D BLOWERS, 01 BOS IN RL17 BOILER.

  • REPAIR AND MAINTENANCE SERVICE 66 IK 525 BLOWERS, 45 IR3D BLOWERS AND 12 IKAH BOILER BLOWERS IN THERMOELECTRIC PLANT.

  • LINING OF TWO CHIMNEYS UNITS U1 AND U2.

  • INSTALLATION OF A CHEMICAL RECOVERY BOILER.

  • INSTALLATION AND COMMISSIONING OF TAPROGGE INTERNAL CLEANING EQUIPMENT IN THE CONDENSERS OF THREE EL PASO MODEL BOILERS OF 160 MW, WHICH BURN BUNKER 6 AND NATURAL GAS.

Supply of Traditional Industrial Equipment

Industrial Spare Parts

Assessment, installation, repair, and commissioning of industrial boilers.

  • EVALUATION OF THE STEAM SYSTEM TO CORRECT OPERATIONAL PROBLEMS IN MORE THAN 10 INDUSTRIAL PLANTS.

  • ADJUSTMENT OF THE AIR/FUEL RATIO, WITH ADJUSTMENT OF THE CONTROL SYSTEM RESPONSES IN MORE THAN 20 INDUSTRIAL STEAM GENERATION UNITS, TO RESTORE STEAM GENERATION CAPACITY.

  • DESIGN AND COMMISSIONING OF HUMAN-MACHINE INTERFACE SYSTEMS, USING IFIX 5.0, IN MORE THAN 20 INDUSTRIAL STEAM GENERATION UNITS.

  • EVALUATION OF THE THERMAL EFFICIENCY OF STEAM GENERATION EQUIPMENT, WITH RECOMMENDATIONS TO INCREASE EFFICIENCY.

  • REVIEW AND REPAIR, WITH MANUFACTURER SUPPORT, OF DUAL GAS/DIESEL BURNERS FOR INDUSTRIAL BOILERS.

  • SUPPLY, INSTALLATION, AND COMMISSIONING OF A 150,000 Lb/Hr BOILER AND A 100,000 Lb/Hr BOILER, WITH A STEAM PRESSURE OF 350 psi.           

  • ADAPTATION OF SAFETY SYSTEMS (BMS), AS WELL AS CONTROL AND START-UP SYSTEMS FOR MORE THAN 14 MODEL “D” AND “A” BOILERS OF DIFFERENT CAPACITIES OF 250 psi.

  • EVALUATION OF SAFETY (BMS) AND CONTROL SYSTEMS FOR MORE THAN 20 DUAL GAS/DIESEL BOILERS OF DIFFERENT MODELS, UP TO 150,000 Lb/Hr, STEAM PRESSURE OF 350 psi.           

  • REPAIR, ADAPTATION OF CONTROL SYSTEMS AND START-UP OF FOUR MODEL “A” BOILERS OF 180,000 Lb/Hr OF 250 psi.

  • INSTALLATION OF WATER LEVEL COLUMNS IN THE UPPER DOME OF FOUR BOILERS, INCLUDING CONTAINERS WITH ELECTRODES FOR ALARMS AND SHUTDOWNS.

  • INSTALLATION OF CONTAINERS WITH HEAT EXCHANGERS FOR WATER SAMPLING FROM THE UPPER DOME.

  • ADJUSTMENT WITH THE CALIBRATION OF MEASURING AND CONTROL EQUIPMENT, INCLUDING PRESSURE GAUGES, PRESSURE SWITCHES, THERMOMETERS, TEMPERATURE SWITCHES, PRESSURE TRANSMITTERS, TEMPERATURE TRANSMITTERS, AMONG OTHERS.    

  • REPAIR OF BURNERS, INCLUDING THE WALL AND THROAT, IN MORE THAN 30 BOILERS OF DIFFERENT CAPACITIES.

  • INSPECTION TO ASSESS THE CONDITION AND DEFINE THE SCOPE OF THE REPAIRS NECESSARY TO RESTORE THE AVAILABILITY OF THE STEAM GENERATION UNITS, WITH UP TO 20% RECOVERY OF THEIR CAPACITY, IN MORE THAN 40 BOILERS, WITH DIFFERENT STEAM CAPACITIES, VARIOUS FUELS.

  • DESIGN, ADAPTATION WITH THE COMMISSIONING OF CONTROL SYSTEMS AND PLANT DCS, BASED ON IFIX WITH OPC DRIVERS, USING THE CONTROLLOGIX PLC.

  • REVIEW OF BOILER CONTROL SYSTEMS, BASED ON CONTROLOGIX.

  • EVALUATION AND AUDIT OF STEAM GENERATION SYSTEMS FOR MORE THAN 10 INDUSTRIAL PLANTS.

  • REVIEW OF THERMAL EFFICIENCY IN INDUSTRIAL BOILERS UP TO 150,000 LB/HR, OF VARIOUS FUELS, IN MORE THAN 20 STEAM GENERATION UNITS.

  • REVIEW OF CONTROL SYSTEMS FOR STEAM GENERATION EQUIPMENT, BASED ON SIEMENS PLCs.

  • EVALUATION OF BURNER SAFETY SYSTEMS (BMS) IN MORE THAN 20 STEAM GENERATION UNITS OF DIFFERENT CAPACITIES.

  • INTERNAL REVIEW OF FURNACES FOR DIFFERENT INDUSTRIES.

  • WITH THE SUPPORT OF THE MANUFACTURER, REPAIR AND COMMISSIONING OF INDUSTRIAL BOILERS FOR DIFFERENT CUSTOMERS.

  • COORDINATION OF THE MANUFACTURER'S TECHNICAL STAFF FOR THE EVALUATION OF STEAM GENERATION EQUIPMENT, WITH THE PREPARATION OF TECHNICAL REPORTS INCLUDING NON-DESTRUCTIVE TESTS.

  • EVALUATION OF SOOT BLOWER SYSTEMS, WITH THE SUPPORT OF THE MANUFACTURER, FOR INTERNAL CLEANING OF THE FIREBOX IN STEAM GENERATORS OF DIFFERENT CAPACITIES. 

Thermoelectric Power Plants

With the support of our members

We have the capacity to supply, repair, install and commission boilers for both power and industrial use, with traditional fuel burners and new technologies.

evaluation.gif
13b.jpg
9C.jpg
ezgif.com-animated-gif-maker (2).gif
boilers fm.gif

Industrial plants

with the support of the represented companies

We have the capacity and experience to supply, repair, install and commission industrial equipment such as boilers, burners, and others.

Vibration Measurement

With the support of the manufacturers

We have the capability to supply, install and commission vibration measurement equipment with new technologies

vibra.gif

Supply of spare parts for turbines

Contacts

• Eng. Nelson Quintero – President. Email: nquintero@thermopwr.com

Telephone: +58 261-7923678

• Eng. Franklin Quintero – Manager. Email: fquintero@thermopwr.com

Telephone: +58 424-6279564

• Mr. Jorge Luis Quintero - Regional Manager. Email: jlqr@thermopwr.com

Phone: +57 312-3641264

Thank you for your visit.

bottom of page