Thermopower has the support of the manufacturers of the equipment it supplies

Projects (Reference)

Unit recovery work

Electrostatics with the support of Babcock & Wilcox

Work has been carried out on boiler retubing, changing sections of tubes, repairing domes, changing headers, among others; which have allowed the return to steam generation.

ezgif.com-animated-gif-maker.gif
ezgif.com-animated-gif-maker.gif

Fuel conversion

with the support of Babcock & Wilcox

We have experience in fuel conversion work in boilers used for electricity generation in thermoelectric power plants.

Unit Evaluation

With the support of the manufacturers

Boiler evaluation work has been carried out in thermoelectric plants in Venezuela, Colombia, Panama, among other countries.

inspection.gif
evaluation.gif

Boiler Inspection

with the support of Babcock & Wilcox

Inspections have been carried out on industrial boilers and thermal power plants, using different fuels such as natural gas, diesel, oil, bunker fuel, coal, and biomass, including their auxiliary systems.

Installation of Industrial Boilers

With the support of the manufacturers

We have experience in the transfer, installation and commissioning of industrial boilers of different capacities, using fuels such as: natural gas, fuel oil, petroleum, and others.

boilers fm.gif

Boiler tuning and starting

ezgif.com-gif-maker (1).gif

With the support of the companies represented, we have experience in adjusting: the air/fuel ratio, the response speed of control systems, water levels in the steam dome of the hip, the response speeds of logic controllers; as well as the start-up of boilers after repairs and major maintenance.

Training of personnel at industrial and thermoelectric plants

Training courses have been given to personnel at different customers' plants on the use and maintenance of steam generation and auxiliary equipment such as: soot blowers, video cameras for boiler furnaces, and control systems for automated boiler blowing.

Blowers ref.gif

Supply of spare parts for turbines

Contacts

• Eng. Nelson Quintero – President. Email: nquintero@thermopwr.com

Telephone: +58 261-7923678

• Eng. Franklin Quintero – Manager. Email: fquintero@thermopwr.com

Telephone: +58 424-6279564

• Mr. Jorge Luis Quintero - Regional Manager. Email: jlqr@thermopwr.com